Gever / Thermoelectric power plant

Primary Energy Necessary 157,095 TEP
Electricity used in the plant 688,836 MWh
LV Steam used in the plant 625,714 t
Electricity sold to the market 0 MWh

* including energy produced by the Calcinere (SIED) hydro–electric power plant

  • The power plant generates all the technological steam required by the paper mill.
  • The 130kV electricity power grid, together with the 66kV direct line from the Calcinere hydro–electric power station, integrates deficits in autonomous energy production on a need now basis.

Power Plants

  • Two sections, each with a 40 MW Turbogas GE, a post–combustion 104 ton/h steam generator and a 55 MVA alternator.
  • A 40 MW turbo steam generator.
  • A 53 MVA alternator for the turbo steam generator.